Reconstruction and rehabilitation of water supply system
Reconstruction of the existing water supply network within the settlement, built of existing asbestos cement pipes. The length of the new route is 25,109 m. Pipes with diameters with DN 90, DN 110, DN 125, DN 140, DN 160, DN 180 to DN 200 have been delivered and laid on the new water supply system. 127 pieces have been installed on the site. above-ground fire hydrants, 351 pcs. shut-off valves. 691 units are installed on all deviations to the subscribers. water meter shafts. The total excavation of the site is 37,000 m3, the backfill with unsorted crushed stone is 30,780 m3, the sand bed under the laid pipes - 11,125 m3.