Reconstruction of Yavorov Street
The total area of the street is 3958 m2;
The main construction and assembly works that have been completed are: excavation SMR - 2522 m3; delivery and laying of crushed stone – 2070 m3; breaking up of old and delivery and laying of new curbs - 2247.50 m; demolition of existing pavement and supply, and installation of new pavement tiles – 2650 m2; laying of asphalt mixture for the base layer and lower layer (binder) of the road surface coating - 907 t; laying asphalt mixture of dense asphalt concrete - 3958 m2; delivery and installation of road signs - 31 pcs.; making a horizontal marking - 209 m2.