Projects
Reconstruction of street water supply and street network
The construction includes the construction of new street plumbing on seven streets, as well as the replacement of curbs, sidewalks and laying of the new asphalt pavement. For the new plumbing, high-density polyethylene pipes with diameters φ90 and φ110 and a total length of 2734 m, have been laid, there were also 24 overhead fire hydrants and 31 shut-off valves that have been supplied. 169 plumbing diversions to subscribers were built. The total excavation of the construction is 5530 m3. They are 2,660 m of curbs, 2,467 m2 of pavement tiles replaced. There is also 13,788 m2 of new asphalt laid.